Mesfin H. Tewolde
Civil Engineer & Hydrologist [EUR ING MPQF SCNAT ]
© 2025 All rights reserved.
Archives
GERD: The 4th Filling (11 sept 2023)

Mai Msilam Dam Reservoir Current Status_Eritrea

GERD FIlling, Animation

TEKEZE Dam Reservoir Current Status (26 August, 2023), Ethiopia

GIBE-III Dam Reservoir Current Status (26 August 2023), Ethiopia

Grand Ethiopian Renaissance Dam (GERD) Current Status (2023), Volume Analysis

10 Years, Annual Max and Min Surface Temperature Map of Switzerland

10 years, Annual Max & Min Surface Temperature Map of South Africa

10 Years, Annual Mean Surface Temperature of Switzerland

10 Years of Annual Mean Surface Temperature of South Africa
